Two quotes for the same roof can differ a lot because they describe different jobs. This sheet lists what moves the price, what a written quote should contain and a tool to compare quotes on the same basis. We do not publish price lists: prices change with region, season and year, and a local measured quote is the only reliable number.

N-02Notes

The cost drivers

What a contractor prices when they look at your building.

  1. NOTE 01

    Access and height

    Scaffolding, lifts or rope access can cost as much as the waterproofing itself on high walls and roofs.

  2. NOTE 02

    Area and number of details

    Drains, upstands, pipes and corners take far longer per metre than open flat areas.

  3. NOTE 03

    Condition of the substrate

    Cracks, spalling concrete and wet screed have to be repaired and dried before any membrane goes on.

  4. NOTE 04

    Tear-off and disposal

    Removing old layers, especially several of them, adds labour, skips and disposal fees.

  5. NOTE 05

    Method and number of coats

    Products differ in price, and thickness or extra layers add material and time.

  6. NOTE 06

    Weather and drying time

    Rain, cold and humidity stretch the job and can add return visits.

  7. NOTE 07

    Warranty scope

    Longer written warranties often come with specified products, inspections and stricter preparation.

C-03Compare

Patch, partial or full?

The scope matters more than the unit price. A cheap patch on the wrong spot is the most expensive option.

ItemASpot repairBPartial re-waterproofingCFull replacement
ScopeOne crack, joint or detailOne zone, for example around outlets or one roof sectionWhole roof, floor or wall system
When it fitsSource found, rest of the system soundDamage limited to one area, old system still bondedRepeat leaks, widespread blistering, end of service life
Risk of repeat leaksHigher if source is unsureMedium; check the joinsLowest when done well
What to askHow was the source confirmed?How is new joined to old?What is removed, and what warranty applies?

Q-04Compare

Quote comparison tool

Enter the total price, the area each quote covers and the warranty years written in it. Use the same currency for all three.

Input

Leave quote C at 0 if you only have two. Starting values are placeholders. Replace them with your own measurements and the product data sheet.

Take-off

A · price per area
—per m²
B · price per area
—per m²
C · price per area
—per m²
A · per warranty year
—per yr
B · per warranty year
—per yr
C · per warranty year
—per yr

Lowest per area · per warranty year

—

Only compare quotes that cover the same scope. Check the quote form below before you trust the numbers.

F-04Quote check

What a written quote should list

Tick each item your quote actually states. Missing lines are questions to ask before you sign.

Quote review · 9 items

0 / 9 ticked

open

Some lines are missing. Ask for them in writing; two quotes can only be compared when both list the same items.

Caution

Be wary of

Most contractors are honest, but a few patterns are worth a second opinion. Check licensing and registration rules with your local authority or consumer protection agency.

  • —Pressure to sign the same day or a discount that expires tonight
  • —A price with no measured area or product named
  • —A large payment up front before any work or material arrives
  • —A warranty that is promised but not written into the contract

Q-06RFI log

Cost FAQ

RFI-01Why is my quote higher than a neighbour's?

Response

Access, the condition of the surface, the number of details and the products chosen differ from building to building. Compare scope line by line before comparing totals.

RFI-02Does a longer warranty mean better work?

Response

Not on its own. Read what it covers, who stands behind it and its conditions, such as yearly inspections. A long warranty from a company that may not be around is worth less than its number.

RFI-03Is DIY cheaper in the end?

Response

For sealant and small coatings it often is. For roofs, basements and showers, a failed DIY membrane can cost more than doing it once properly, plus damage below.

RFI-04Should I pay a deposit?

Response

Deposits for ordered materials are common in many places. Keep it proportionate, in writing, and tied to delivery or a stage of work. Common contractor mistakes has more on this.

Next sheet

Choosing a contractor

Posts on picking a waterproofing company and the mistakes to avoid.